Page 1 of 1
To Do List 2008:
Posted: Sat Dec 15, 2007 5:44 am
by Envoy CDX
Well, I've just been going through the things that I feel have to be done next year before I go somewhat insane..
The list is in no particular order, I can see my soldering iron taking a wobbly and packing up though....
If anyone has any of the parts I may require can you please PM me with a price? Cheers
To Do List 2008:
Re-wire heated leather Seats
Wire in Electric Door Mirrors
Re-wire the rear drivers side electric window (as it will only go down and not back up from the console.)
Tidy up the rear arches
Replace under headlight panel
Touch up bonnet and remove stone chips / early rust stages
Tidy Paintwork
Install rear floor heaters
Install floor well lights
Install Kerb lights into the doors (front and rears)
Replaces all door hinge pins
Realign passenger side doors
Replace A Pillar Trim(s)
Clean up the head lining
Install sound deadening for floor, and relay carpets
Install all new bits of trim (inner sill trim, kick panels,)
Rub back, fill, and spray up rear lip spoiler for fitting
Pick up a set of alloys
Re: To Do List 2008:
Posted: Sat Dec 15, 2007 9:52 am
by FoxyCav
My to do list never seems to end either.
Fix side skirts to Car
Prep and paint lip spoiler
tint windows
get paint on car sorted out(ideally a blow over to smarten it up)
Buy and fit chrome heatshield
prep and paint front sri bumper
Source a mint interior
clean up engine bay
fit electric mirrors
tweak the engine a bit
find some shorter shocks
and if i think some more sure i can think of loads more i want to do
fingers crossed for your soldering iron gary

Re: To Do List 2008:
Posted: Sat Dec 15, 2007 11:09 am
by k1ngy
i dont think i have much left to do now
replace clutch + cable
find sri bumpers, skirts and spoiler
once found fit them
get some new tyres
fit the black dash
re fit decat pipe
Re: To Do List 2008:
Posted: Sat Dec 15, 2007 12:45 pm
by Envoy CDX
FoxyCav wrote:
fit electric mirrors
fingers crossed for your soldering iron gary


who's fitting your electric mirrors?

Re: To Do List 2008:
Posted: Sat Dec 15, 2007 12:58 pm
by Rich P
sort sunroof
new arches and sills
270 camshaft and vernier pulley
new wheels or a refurb
possibly get front seats retrimmed
new bonnet cable
wire up new speakers
get electric mirrors workin proper
polish rocker cover
get a battery case made
im sure there will be more things to do.....
Re: To Do List 2008:
Posted: Sat Dec 15, 2007 1:30 pm
by FoxyCav
Envoy CDX wrote:FoxyCav wrote:
fit electric mirrors
fingers crossed for your soldering iron gary


who's fitting your electric mirrors?

you are hopefully, my hero lol

Re: To Do List 2008:
Posted: Sat Dec 15, 2007 4:48 pm
by Envoy CDX
Re: To Do List 2008:
Posted: Sat Dec 15, 2007 4:59 pm
by gsi dave
will have some sideskirts for sale when i get round to fitting me gsi ones if interested
Re: To Do List 2008:
Posted: Sat Dec 15, 2007 9:02 pm
by Mark
Get laid.
Re: To Do List 2008:
Posted: Sat Dec 15, 2007 11:37 pm
by k1ngy
sri valver wrote:will have some sideskirts for sale when i get round to fitting me gsi ones if interested
sweet, drop me a pm when their ready to go fella
Re: To Do List 2008:
Posted: Sat Dec 15, 2007 11:49 pm
by Envoy CDX
Mark wrote:Get laid.
Palmela Handerson costs less, theres no arguements and you stil get to do what you want..
Re: To Do List 2008:
Posted: Sun Dec 16, 2007 1:34 am
by Mark
Sometimes it's nice to have the hassle..lol
Re: To Do List 2008:
Posted: Sun Dec 16, 2007 9:12 am
by Gsi-R
Aint that the truth.! lol
Re: To Do List 2008:
Posted: Sun Dec 16, 2007 11:04 am
by Cavyman_130
2008:
Renew suspension for some Eibach springs with Koni shockers
Find a replacement bonnet
Get front panel and front bumper painted to get rid of stone chips
Uprated cam with vernier pulley
maybe some head work
and a full service after MOT
and thats about all really, everything else has been done
Re: To Do List 2008:
Posted: Sun Dec 16, 2007 11:09 am
by Rich P
unfortunately all my plans on my to do list have been put on hold because im looking for a new job

Re: To Do List 2008:
Posted: Sun Dec 16, 2007 2:32 pm
by RICKSON
Buy mk2 astra GTE 8V
Tint windows on cav
fit my GSI rear bumper to my sri hatch cav
Fit my rear spoiler on cav
spray cav pearlescent blue/purple over a black base coat
fit let engine to cav
and on and on etc etc
Re: To Do List 2008:
Posted: Sun Dec 16, 2007 5:15 pm
by dave's.veccy
as its now packed up i have a headgasket change to do
spray + fit SRi skirts ive had in the shed since the summer
finish the front bumper finally
treat all rust
renew the windscreen
Re: To Do List 2008:
Posted: Mon Nov 17, 2008 1:07 pm
by Envoy CDX
It's been a bad year for getting stuff done on the Cav I guess.
Re-wire heated leather Seats - check and sold (pointless really wasn't it)
Wire in Electric Door Mirrors - still not done yet, but theres still a whole 6 weeks left!

Re-wire the rear drivers side electric window - still not looked ay
Tidy up the rear arches - erm, I havent had time with college and such

Replace under headlight panel - decided I'm going to knock the dent out and touch up the stone chips (cheaper, and easier)
Touch up bonnet and remove stone chips / early rust stages (cleaned out and packed with wax till after the new year now)
Tidy Paintwork - Cleaned up some of the blemishes, cut back the bodged repair jobs done earlier last year and this year - looks completely diffferent now)
Install rear floor heaters (require SRI blower installed - scrapped idea for now)
Install floor well lights - another unfufilled job
Install Kerb lights into the doors (front and rears) - got the kerblights, just need wiring in now

Replaces all door hinge pins - lost the hinge pins

Realign passenger side doors - as above
Replace A Pillar Trim(s) - will recover in the new year.
Clean up the head lining - steam cleaner job maybe.
Install sound deadening for floor, and relay carpets - not till i've fixed the leak completely.
Install all new bits of trim (inner sill trim, kick panels,) - getting there.
Rub back, fill, and spray up rear lip spoiler for fitting - not this side of new year
Pick up a set of alloys - done - 1st March 2008 - Corsa SXi alloys - rather fetching on the cav
