Today I started tackling another job that I've been putting off for ages, the floor pans.
I don't mind admitting that I've made a bit of a cock up, as I wasnt familiar with the construction, I accidentally started cutting through the front chassis rails. Not the end of the earth, just means a bit more welding. Talking of which, I couldn't do any this morning as due to an old neck injury flaring up( a bone in my neck sometimes pops out and pushes on a nerve) I couldn't support the weight of the welding mask on my head.
I took the opportunity to rust treat everything and coat the inside with yet more red oxide.
If you look closely at the support bracket, about half of it needs replacing.
![Image](https://i.postimg.cc/tgx6fF2L/IMG-20200802-083012.jpg)
![Image](https://i.postimg.cc/FFDYTPhY/IMG-20200802-093013.jpg)
![Image](https://i.postimg.cc/mgM2WVWN/IMG-20200802-103407.jpg)
For the repair I've got a pattern complete floor pan. Originally I was going to just splice in a small bit, but if it was yours would you just put the whole panel in, any thoughts?
![Image](https://i.postimg.cc/sfQ2J3HN/IMG-20200802-093323.jpg)